COMMISSION: 1/2256 ACCLAMATOR PT4

The drilling is progressing!! I’m using a combination of a light duty battery-powered drill for the thicker areas and a pin vise for the thin spots. So far the one side trench and the upper structure areas are done. I’ve begun working down the dorsal spine. Overall it’s coming along.

I even plugged in the LEDs to check the flicker effect!
see video here: https://www.instagram.com/p/BDFOO7ZzUip/
I still need to cut a hole for the flicker cycle button, which will probably be along the spine area. acc_IMAG9847

Advertisements

2 thoughts on “COMMISSION: 1/2256 ACCLAMATOR PT4

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s