COMMISSION: 1/2256 STAR DESTROYER AVENGER PT5

Progress on this guy is slow but every little bit of effort counts. Before I attach the engine array to the rear end I decided to cut off those extra rings on the main nozzles. I should have done it before securing them though… I’ll also have to drill for the LEDs before mounting, too. All the pipe work and detailing can wait until later.

The warpage still continues to be an issue as well. An internal bracing system is a common practice with this kit in general and my build will be no different. I picked up some rigid wood beams (they barely flex by hand) and will first create a triangle frame in the upper hull, screwed in most likely, then a single rod along the ventral line to support the mounting post. I can also use these beams to help fix some of the warping…hopefully.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s