COMMISSION: 1/2256 STAR DESTROYER AVENGER PT4

Progressing slowly. One of the bigger operations of this build is joining all the main hull parts. There is still a bit of warping along the main pieces, hopefully with some heat and time (clamped to the radiator) it will even out. The heat gun is standing by just in case it’s not enough. However, I do plan on cutting and adding some reinforcement bars on the inside once I get some of these larger portions completed. The neck/bridge section is still unattached as I’m still thinking of making it removable for shipping. You can see the kit already has a TON of detail, but I will be adding more because there are a lot of bare areas. Not to mention the part fit is not spectacular by any means and there are a lot of gaps that will need to be both filled from the inside and detailed on the front.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s